Tentative Work Schedule

September 19, 2018

 

 

Work in the NE section consists of patching pot holes on NE CR 225

 

Work in the NW section consists of Grading NW 212th, 74th, 215th Way and 51st., Pull ditches on NW 237th St., Clean out ditch at 12592 NW CR 225 and Dig Ditch on NW 53rd Ave.

 

Work in the SE section consists of Grading Crystal Lake Homesites area and Working on ditch on SE 21st Ave.

 

Work in the SW section consists of Trimming trees by guardrail on SW CR 18

 

 

We received 3 DOC Squads for a total of 18 people

 

1 Squad will be Cleaning out a ditch at 12592 NW CR 225

 

1 Squad will be Picking up trash at the Hampton Lake Boat Ramp and Trimming trees around the guardrail on SW CR 18

 

1 Squad will be assisting with traffic control digging and cleaning out ditch on SE 21st Ave.