Tentative Work Schedule

August 7, 2019

 

Work in the NE section consists of Mowing NE 204th

 

Work in the SE section consists of Fill in & Grade SE 46th Loop and SE 134th, Grade SE 16th Ave. and Crystal Lake Homesites, Mow Keystone Landfill, SE CR 214, SE 8th Ave., SE 57th St., SE 109th, SE 101st., SE 46th, SE 38th and Theressa Ball Park and Patch Pot Holes on SE 148th St.

 

Work in the SW section consists of Grading SW 155th, Mowing SW 85th Lane and SW and SW 75th Ave.

 

 

We received 3 DOC Squads for a total of 17 people

 

1 squad will be Weed Eating NW CR 229 and NW CR 200A

 

1 Squad will be Weed Eating NW CR 225 and NW 216th St.

 

1 Squad will be Cleaning out the Concrete Ditches on SE 5th Ave.