Tentative Work Schedule

March 16, 2021

 

Work in the NW section consists of Grading NW 267th St. and NW 251st St., Cleaning out ditches on NW CR 225, NW CR 125 and NW 188th St., Patch Pot Holes on NW 84th Ave. and Mowing the ditches on NW CR 225

 

Work in the SE section consists of Grading reads off of SE CR 18 and then going to Crystal Lake Homesites area and Mowing SE CR 18 and SE 9th Ave.

 

Work in the SW section consists of Grading SW 106th Ave., Picking up debris on SW 132nd Ave. and Mowing SW CR 225A and SW CR 18 with the Zero Turn Mower

 

 

We received 2 DOC Squads for a total of 9 people

 

1 Squad will be Picking up trash and weed eating on NW CR 225 and SE CR 21B

 

1 Squad will assisting with Patching Pot Holes on NW 84th Ave.