Tentative Work Schedule

February 27, 2023

 

Work in the NE section consists of Grading NE 20th 

 

Work in the SE section consists of Grading SE 38th (Rhoden Road) and roads off of SE CR 18 going towards Hampton, Picking up trees taken down by Terry McCarthy near Santa Fe Boat Ramp, Shooting Grade and Cleaning out ditches on SE 21st Ave. and Pouring Concrete for the Headwall on SE 49th Ave.

 

Work in the SW section consists of Grading SW 92nd, SW 120th and SW 147th and Watering SW 106th