Tentative Work Schedule

July 11, 2023

 

Work in the NW section consists of Grading NW 71st Ave., NW 178th Loop and NW 36th Ave.

 

Work in the SE section consists of Grading SE 11th Ave., SE 52nd St. and SE 26th Ave., Cleaning out a Ditch on SE CR 18A, Mowing Shoulders on SE 94th St., SE 84th and SE 11th Ave., Mowing the Tax Collector's Office and Sidewalk on SE 8th Ave. and Pick up Firetruck from Keystone Airport and bring back to the Shop

 

Work in the SW section consists of Grading SW 106th Ave. and SW 101st Ave., Mowing SW CR 225, SW 161st St. and SW 144th and Mowing the Sidewalk on SWCR 18 around Hampton Lake and Mowing Sampson City Fire Department

 

We received 2 DOC (BCSO-JAIL) Officers and 3 Inmates and they will be trying to get Dirt and Limerock that has washed from the road into the ditch and driveway back out and onto the SE 1st Ave. in Melrose