Work in the NE section consists of Pulling ditches on NE 19th Lane

 

Work in the NW section consists of Zipping NW 185th and Installing a culvert on NW CR 235

 

Work in the SE section consists of Grading dirt roads off of SE CR 18 from SR 100 towards Brooker, Install culvert at 866 SE 40th Pl., Patch driveway SE 66th St., Mow roads off of SE CR 100A with Side Arm Mower and Mow SE 35th and SE CR 21B

 

 

We received 3 DOC Squads for a total of 17 people

 

1 Squad will be Patching driveways on SE 66th St.

 

1 Squad will be Picking up trash and Weed Eating on SW CR 225 and then going to NW CR 235

 

1 Squad will be directing traffic for installing culverts NW CR 235 & SE 40th Pl