Tentative Work Schedule

September 19, 2019

 

Work in the NE section consists of Cleaning up tree debris on NE 179th St.,  Mow NE 218th St. and Patch Pot holes on NE 14th Ave.

 

Work in the NW section consists of Building a parking lot t Heilbron Springs Fire Dept.

 

Work in the SE section consists of Grading SE 41st, SE 43rd, SE 101st and SE 45th, Clean out ditch on SE 71st St., Patch Pot Holes on SE 17th Ave. and Mow SE CR 221, SE CR 325 and SE CR 18

 

Work in the SW section consists of Grading SW 66th Ave. (later found out trees are being cut and it is unsafe for us to try to Grade while that is going on, will Grade when they are finished) and head toward Graham and Mow SW CR 18, SW CR 225 and SW CR 225A

 

 

We received 3 DOC Squads for a total of 11 people

 

1 Squad will be Weed eating Vogel Pond on SE 3rd Ave.

 

1 squad will be Weed eating and Cleaning out the pipe at the Pratt St. pond

 

1 Squad will be directing traffic for Cleaning out a ditch on SE 71st St.