Tentative Work Schedule

November 7, 2019

 

Work in the NE section consists of Patching a Crossover pipe at the intersection of NE 15th Ln. & NE 153rd St. and Grading NE 171st St.

 

Work in the NW section consists of Grading NW 219th Ter., NW 70th Ave. and NW 41st Ave., Digging ditches on NW CR 235 and Mowing NW CR 125, NW 27th & NW CR 225A

 

Work in the SW section consists of Grading SW 114th St., SW 180th Ave. & SW 180th Pl., Cleaning out Concrete ditch ditches on SW CR 231 (Dedan Loop) and Mowing SW CR 225

 

 

We received 3 DOC Squads for a total of 14 people 

 

1 Squad will be picking up trash and weedeating on NW 216th St 

 

1 Squad will be Weed eating, Picking up trash and Cleaning out Concrete ditches on SW CR 231 (Dedan Loop)

 

1 Squad will be directing traffic and assisting with Digging out ditches on NW CR 235