Tentative Work Schedule

January 17, 2019

 

Work in the NE section consists of Adding rock to milling on NE 204th St., Ditch work on NE 15th Ave. and Patching Pot Holes at 23497 NE 7th Ave.

 

Work in the NW section consists of Grading NW 71st Ave., Patching Pot Holes at 3472 NW 198th St. and 19259 NW 42nd Ave. and Building a Head Wall on NW on 216th St.

 

Work in the SE section consists of Grading SE 49th, 86th, 61st & 66th and Grading SE 17th Ave. & SE 11th Ave. with the Road Boss

 

We received 3 DOC Squads for a total of 14 people 

 

1 Squad will be patching pot holes on NE 7th Ave., NW 198th St. & NW 42nd Ave,

 

1 Squad will be Building a Head wall on NW 216th St.

 

1 Squad will be performing ditch dork on NE 15th Ave.