Tentative Work Schedule

May 16, 2019

 

Work in the NW section consists of Zipping, Grading and Packing NW 196th and NW 38th Ave., Install culvert on NW 219th St (Off NW CR 225) and Mowing NW CR 235 & NW CR 225

 

Work in the SE section consists of Grading SE 38th, SE 87th, SE 9th & SE 16th Ave., Patch driveways at 8630 SE 11th Ave. & 495 SE 72nd and Mow 3 ponds in the Keystone Golf & Country Club area

 

Work in the SW section consists of Installing a culvert on SW CR 231 (Dedan Loop for Kelley Dyal) and Mow SW CR 235

 

 

We received 3 DOC Squads for a total of 12 people

 

1 Squad will be Mowing 3 ponds in the Keystone Golf  Country Club area

 

1 Squad will be Picking up Trash and Weed Eating NW CR 235 (Start at the SR 100 end)

 

1 Squad will be directing traffic for Installing culverts on NW 219th St. & SW CR 231