Work Schedule

 

 

Work in the NW section consists of Grading, Installing a culvert, Cutting, Trimming and Chipping and Mowing

 

Work in the SE consists of Zipping a road

 

Work in the SW consists of Milling a road and Patching troughs

 

 

We received 3 DOC Squads for a total of 15 people

 

1 Squad will assist with Cutting, Trimming and Chipping in the NW

 

1 Squad will assist in placing silk screen on back slope of ditch in SW

 

1 Squad will assist with traffic installing culverts in NW

 

 

1 Squad from The Transition House ( 2 people) will be assisting patching troughs on SW CR 18