Work Schedule

 

 

Work in the NW section consists of Pulling ditches and Cutting, Trimming and Chipping

 

Work in the SE section consists of Grading, Zipping a road and Patching driveways

 

Work in the SW section consists of Grading and Installing a Crossover culvert

 

 

We received 2 DOC Squads for a total of 10 people

 

1 Squad will assist with Cutting, Trimming and Chipping in the NW

 

1 Squad will assist with installing a Crossover culvert

 

 

1 Squad from The Transition House (5 people)  will assist in patching driveways in the SE