Tentative Work Schedule

December 29, 2020

 

Work in the NW section consists of Grading NW 209th, NW 41st and NW 35th and Patch Pot Holes on NW 219th and NW 55th

 

Work in the SE section consists of Grading and Removing trees from SE 49th Ave., Ditch work on SE 144th (Preacher Lee Road), Patch Pot Holes on SE 66th (Paved part) and mowing ROW on SE 38th Ave.

 

Work in the SW section consists of Grading SW 155th St., SW 160th Ave. and SW 136th St.

 

 

We didn't receive any DOC Squads today