Work Schedule

 

Work in the NW section consists of Zipping a road, Grading, Pulling Ditches and Replacing a Crossover pipe

 

Work in the SE section consists of Grading, Mowing, Cutting back, trimming and Chipping and Weed eating

 

 

We received 2 DOC Squads for a total of 12 people

 

1 Squad will be assisting with Cutting, Trimming and Chipping in the SE section

 

1 Squad will be Weed eating in the SE section

 

 

1 Squad from The Transition House (3 people) will be patching driveways