Tentative Work Schedule

September 22, 2022

 

Work in the NE section consists of Grading NE 173rd, NE 12th and NE 171st and Clean out a ditch on NE 14th Ave.

 

Work in the NW section consists of Mowing NW 216th St.

 

Work in the SE section consists of Grading SE 136th Loop and SE 129th St.

 

Work in the SW section consists of Grading NW 68th and Mowing SW CR 235 and SW CR 231

 

 

We received 1 DOC (BCSO-JAIL) Officer and 3 Inmates and they will be assisting with Cleaning out and Weed Eating a ditch on NE 14th Ave.