Tentative Work Schedule

September 16, 2019

 

Work in the NE section consists of Grading NE 171st , Mow Carter Road and Pick up limbs on NE 179th St.

 

Work in the NW section consists of Pulling up concrete form boards at 5916 NW CR 225 and Form and pour concrete at 11177 NW CR 229

 

Work in the SE section consists of Grading Crystal Lake Homesites and Taking up a culvert at the County line on SE CR 325

 

Work in the SW section consists of Grading SW 180th and SW 209th, Patching Pot Holes on SW 175th Ave. & troughs on SW CR 18 and Mowing SW CR 237, SW CR 18, SW CR 231 (Dedan Loop), SW CR 227 & SW CR 225

 

 

We received 3 DOC Squads for a total of 15 people

 

1 Squad will be Patching Pot Holes on SW 175th Ave and troughs on SW CR 18

 

1 Squad will be Pulling up Concrete form boards on NW CR 225 and Forming and Pouring concrete on NW CR 229 then Weed eating NE 179th St

 

1 Squas will be Directing Traffic on SE CR 325 while pulling up a culvert