Tentative Work Schedule

April 4, 2023

Work in the NE section consists of Mowing NE 24th Ave., NE 12th Ave. and NE 171st St. and Cleaning out a Ditch on NE 19th Ave.

 

Work in the NW section consists of Grading NW 219th St., NW 196th St., NW 211th St., NW 55th Ave., NW 56th Lane, NW 177th St, and NW 62nd Ave.

 

Work in the SE section consists of Grading SE 52nd St.

 

Work in the SW section consists of Patching Shoulders on SW CR 235 and Mowing SW CR 237, SW CR 235A and SW CR 18