Tentative Work Schedule

October 29, 2018

 

Work in the NW section will consist of Mowing NW 183rd, NW 184th, NW 33rd and NW 61st off NW CR 225 with the Side Arm Mower, Mow NW CR 229, Grade NW 75th Pl., NW 71st., NW 188th & NW 193rd, Limerock NW 75th Ave., Dig Ditches on NW 84th Ave. and Build a head wall with concrete bags on NW 214th Way

 

Work in the SE section will consist of Trimming & Chipping limbs on SE 16th Way & SE 16th St.

 

Work in the SW section will consist of Hauling & Spreading Dirt and Grading SW 75th Pl., Zipping, Adding Clay & Enzymes to SE 101st Ave. and Mowing SW 151st 

 

 

We received 3 DOC Squads for a total of 19 people

 

1 Squad will be building a head wall with concrete bags on NW 214th Way

 

1 Squad will be Trimming and Chipping limbs on SE 16th Way and SE 16th St.

 

1 Squad will be directing traffic for digging ditches on NW 84th Ave.