Tentative Work Schedule

April 20, 2023

 

Work in the NE section consists of Cleaning out Ditches on NE 21st Ave. and Mowing NE 20th Lane, NE 24th Loop and NE 20th Ave.

 

Work in the NW section consists of Grading NW 71st Ave. and NW 193rd St.

 

Work in the SE section consists of Grading SE 71st St., SE 72nd ST. and SE 73rd St. and Mowing SE CR 21B., SE CR 214 and SE 5th Ave.

 

Work in the SW section consists of Grading and Watering SW 106th Ave. and Mowing around Signs, Mailboxes, Culverts and Guardrails on SW CR 237 and SW CR 18