Work Schedule

 

 

Work in the NE section consists of Scooping Ditches and Mowing

 

Work in the NW section consists Pull Ditches, Grading, Patching Pot Holes

 

Work in the SE section consists of Zipping a road and Patching Pot Holes

 

Work in the SW section consists of Grading an Mowing

 

 

We received 2 DOC Squads for a total of 15 people

 

1 Squad will be patching Pot Holes and then Picking up trash in NW

 

1 Squad will be Picking up trash in the NW