Tentative Work Schedule

January 19, 2021

 

Work in the NE section consists of Grading NE 20th Ave.

 

Work in the NW section consists of Mowing ROW on NW 71st Ave.

 

Work in the SE section consists of Grading SE 87th St. & SE 38th Ave. and Patching Pot Holes on SE 16th St.

 

Work in the SW section consists of Grading SW 163rd St. and SW 66th Lane, Filling in troughs on SW CR 235 and Picking up tree debris on SW CR 231 (Dedan Loop)

 

 

We did not receive any DOC Squads today.