Tentative Work Schedule

August 22, 2018

 

Work in the NW section consists of Pulling ditches on NW 257th, NW 71st and Scooping ditches on NW 53rd

 

Work in the SE section consists of Grading SE 38th, SE 87th, SE 9th, SE 16th, SE 94th

 

Work in the SW section consists of Scooping ditches on SW CR 18, Patching pot holes on SW 101st and Mowing with the Side Arm on SW 85th Lane then heading to Crosby Lake  area

 

We have Chris and Simmie training on Semi to get their CDL Class A license

 

 

We received 3 DOC Squads for a total of 18 people

 

1 Squad will be picking up trash and weed eating on SE CR 100A  and SE 144th (Road to Vystar)

 

1 Squad will be directing traffic for Scooping ditches on SW CR 18

 

1 Squad will be picking up trash and weed eating on NW CR 225