Tentative Work Schedule

November 12, 2019

 

Work in the NE section consists of Grading NE 173rd St. and NE 12th Ave. and Install 2 culverts at 15610 NE 16th Ave.

 

Work in the NW section consists of Grading NW 237th St. (Stop Camp Road at FSP), Patching driveways off of NW CR 125 and Mowing NW CR 225

 

Work in the SW section consists of Cleaning out Concrete pavers on SW CR 231 & SW CR 237 and Grading SW 85th Lane

 

 

We received 3 DOC Squads for a total of 15 people

 

1 Squad will be directing Traffic for Cleaning out Concrete pavers on SW CR 231 & SW CR 237

 

1 Squad will be Picking up trash & Weed eating NW 216th St.

 

1 Squad will be Directing Traffic for Installing 2 driveway culverts 1 on NE 15th Ave. (1)  & on 1 on NE 16th Ave. for the same person