Tentative Work Schedule

February 28, 2019

 

 

Work in the NE section consists of Patching the driveway at 791 NW CR 125

 

Work in the NW section consists of Grading NW 137th, NW 144th, NW 110th, NW 105th & NW 198th, Patching a driveway at 2737 NW CR 125, NW 71st & NW 177th,  Digging & Finishing the ditch on NW CR 125 (Nettles) and going to the ditch on NW 53rd

 

Work in the SE section consists of Patching a driveway on SE 40th

 

Work in the SW section consists of Grading & Packing SW 101st Ave. & Grading SW 155th, SW 136th & SW 160th

 

 

We received 3 Doc squads for a total of 16 people

 

1 Squad will be Picking up trash and weed eating on SW CR 225 starting at SW CR 227 and going towards 3 Pipes

 

1 Squad will be Patching driveways on NW 71st, NW 177th and SE 40th 

 