Tentative Work Schedule

August 1, 2019

 

Work in the NE section consists Mowing NE 173rd St., NE 19th Lane, NE 12th Ave. & NE 21st Ave.

 

Work in the NW section consists of Grading NW 51st Ave., Patching Pot holes on NW 182nd Way, Mow NW 183rd, NW 182nd Way, NW CR 225 and NW CR 229

 

Work in the SE section consists of Grading SE 44th Ave. SE 49th Ave. & off SE 21st Ave., Mow SE CR 221 (both sides), SE CR 18 & SE CR 325 and Digging the ditch at 14426 SE CR 100A

 

Work in the SW section consists of Grading SW 130th Pl., Pull ditches on SW 160th Ave., SW 136th St. & SW 155th St., Mow SW CR 231 (Dedan Loop), SW CR 231, SW CR 225 & SW CR 18,  and Patch Pot Holes on SW 83rd Ave.

 

 

We received 3 DOC Squads for a total of 15 people. 

 

1 Squad will be Picking up trash on SW CR 18 from SW 147th and go to 301

 

1 Squad will be cleaning out a ditch on NW 182nd Way

 

1 Squad will be directing traffic for Installing a culvert on SE 48th Ave.