Tentative Work Schedule

January 24, 2019

 

Work in the NE section consists of Adding limerock to milling on NE 204th St., Dig Ditches on NE 17th Ave. and Trim limbs with Buzz Saw on NE 223rd St.

 

Work in the NW section consists of Grading Ferguson Loop and Grading Pleasant Grove area with the Road Boss

 

Work in the SE section consists of Grading roads off SE 21st Ave. and 301

 

Work in the SW section consists of Patching troughs at intersection of SW CR 231 and SW CR 235

 

 

We received 3 DOC Squads for a total of 15 people

 

1 Squad will be Picking up trash and weed eating on SE CR 21B

 

1 Squad will be Patching troughs at the intersection of  SW CR 231 and SW CR 235

 

1 Squad will be directing traffic for digging ditches on NE 17th Ave

  

 