Tentative Work Schedule

December 17, 2018

 

Work in the NE section consists of Working materials into the milling on NE 204th St.

 

Work in the NW section consists of Re-building Head Wall on NW 216th St. and Patching driveways at 11261 & 12475 NW CR 225

 

Work in the SE section consists of Re Grading SE 50th St., SE 51st St. and SE 46th Loop, Mowing SE 52nd St., SE 51st St. and SE 50th St. and Grading SE 11th Ave with Road Boss

 

Work in the SW section consists of Grading SW 160th Ave. and SW 155th Ave., Checking the condition of the ditch on SW CR 100A (Edwards Road) and Grading SW 106th Ave. and SW 104th Ave. with the Road Boss

 

 

We received 3 DOC Squads for a total of 17 people

 

1 Squad will be Re-building the Head Wall on NW 216th St.

 

1 Squad will be Picking up trash and Weed eating on NW CR 233

 

1 Squad will be Picking up trash and Weed eating on SW CR 100A (Edwards Road)