Tentative Work Schedule

January 16, 2019

 

Work in the NE section consists of Adding limerock to the milling on NE 204th St., Digging the ditch on NE 17th Ave. and Patching pot holes on NE 7th Ave.

 

Work in the NW section consists of Grading, Patching pot holes on NW 198th St. and NW 42nd Ave, Trimming limbs on NW 42nd Ave. and Building a Head Wall on NW 216th St.

 

Work in the SE section consists of Grading Crystal Lake Homesite area

 

Work in the SW section consists of Grading SW 101st with the Road Boss and Patching a driveway at 6576 SW CR 100A

 

 

We received 3 DOC Squads for a total of 14 people

 

1 Squad will be patching pot holes in the NE, NW and SW

 

1 squad will be building a Head Wall on NW 216th St.

 

1 Squad will be digging a ditch on NE 17th Ave.