Tentative Work Schedule

March 31, 2021

 

Work in the NE section consists of Mowing ROW on NE 20th Ave. and Mowing NE 216th, NE 213th and NE CR 225

 

Work in the NW section consists of Grading NW 71st between NW CR 229 and NW CR 229A, Opening up culverts and getting water to flow on NW 42nd Ave. and NW CR 225 and Scooping and Blowing out culverts on NW 185th, NW 188th and NW 84th

 

Work in the SE section consists of Mowing, Weed eating and Cleaning fence line at the Old landfill

 

Work in the SW section consists of Grading SW 163rd

 

 

We received 2 DOC Squads for a total of 6 people

 

Both Squads will be Cleaning the Fence line at the old Land fill