Work Schedule

 

 

Work in the NW section consists of Grading, Patching pot holes and driveways, Cutting, Trimming and Chipping

 

Work in the SE section consists of Pulling ditches and adding Clay to road. Grading and Mowing

 

Work in the SW section consists of Pulling ditches

 

 

We received 2 DOC Squads for a total of 11 people.

 

Both Squads will be picking up trash and weed eating in the SE & SW

 

 

1 Squad from The Transition House (2 people) will be patching pot holes and driveways in the NW section