Work Schedule

 

Work in the NE consists of Patching washed out driveway

 

Work in the NW consists of Hard Blading, Chipping debris and Mowing

 

Work in the SE consists of Hard Blading

 

Work in he SW consists of Hard Blading, Chipping debris and Fixing washouts

 

 

We received two (2) DOC Squads for a total of 12 people

 

1 squad will be chipping in the NW section

 

1 squad will be chipping in the SW section

 

 

1 squad from the Transition House (3 people) will be patching driveways in NE section