Tentative Work Schedule

December 5, 2022

 

Work in the NE section consists of Grading NE 173rd

 

Work in the NW section consists of Grading NW 178th Loop, NW 219th and NW 53rd

 

Work in the SE section consists of Working on the Outfall ditch and Building a Headwall on SE 11th

 

Work in the SW section consists of Grading SW 101st, Mowing ROW on SW 106th, Mowing SW 132nd and SW 132nd Pl. and Mowing (with Zero turns) and Weed Eating SW CR 235

 

 

We received 1 DOC Officer (BCSO-JAIL) and 2 Inmates.  They will be assisting on SE 11th.