Tentative Work Schedule

April 13, 2021

 

Work in the NE section consists of Adding, Spreading Milling and Prepping NE 204th for Fog Sealing and Grading NE 236th and NE 7th Ave.

 

Work in the NW section consists of Cleaning out ditches on NW 71st Ave. and Mowing NW CR 235

 

Work in  the SE section consists of Grading SE 71st, SE 72nd and SE 73rd, Patching Driveways on SE 50th St., Patching washouts at the Old Landfill and Picking up thrown out furniture on SE 30th St., SE 46th Loop and SE 1st.

 

Work in the SW section consists of Mowing SW CR 235

 

 

We did not receive any DOC Squads nor Inmates