Tentative Work Schedule

June 1, 2022

 

Work in the NE section consists of Mowing ROW on NE 19th Ave.

 

Work in the NW section consists of Grading NW 74th Ave. and NW 215th Way and Repairing Bridge on NW 74th Ave.

 

Work in the SE section consists of Grading SE 31st and SE 50th and Trimming Trees on SE 41st St. and SE 11th Ave.

 

Work in the SW section consists of Grading SW 82nd St., SW 155th, SW 137th and SW 144th and Mowing SW CR 18 and SW CR 225

 

 

We received 2 DOC (BCSO-JAIL) Officers and a total of 4 Inmates

 

1 Squad with 2 Inmates will be assisting with the Bridge Repair on NW 74th Ave.

 

1 Squad with 2 Inmates will be Weed Eating Vogel Pond (SE 3rd Ave.) in Keystone Golf and Country Club