May 13, 2024

 

Work in the NE section consists of Grading and Pulling Ditches on NE 171st St. and NE 5th Ave.

 

Work in the NW section consists of Grading and Pulling Ditches on NW 194th St. and NW 44th Ave. and Grading, Prepping, Watering and Rolling NW 38th Ave.

 

Work in the SE section consists of Mowing SE CR 18 and Picking up Storm debris on SE 47th Ave.

 

Work in the SW section consists of Mowing Shoulders of the road on SW 147th Ave. and Picking up Storm debris on SW CR 231 (Dedan Loop) and SW 160th Ave.