Tentative Work Schedule

Sept. 4, 2018

 

 

Work in the NE section consists of Pulling stump out of ditch on NE 14th Ave.

 

Work in the NW section consists of Limerocking NW 105th, Replacing crossover pipe on NW 71st, Pulling ditches on NW 74th Ave., Patching pot holes on NE 45th and 199th and Digging out ditch on NW 53rd Ave.

 

Work in the SE section consists of Mowing SE 129th St. and SE 21st Ave. with the Side Arm mower

 

Work in the SW section consists of Grading SW 163rd, SW 105th, 92nd, and SW 66th off of CR 18

 

 

We received 3 DOC Squads for s total of 18 people

 

1 Squad will be patching pot holes on NW 45th and NW 199th

 

1 Squad will be getting a stump out of the ditch on NE 14th Ave. then Trimming and Chipping trees on NE 204th

 

1 Squad will be weed eating and picking up trash at the ponds in the Keystone Golf and Country Club