Tentative Work Schedule

August 14, 2023

 

Work in the NE section consists of Grading NE 12th, NE 171st and NE 173rd

 

Work in the NW section consists of Grading NW 35th Ave. and NW 209th and Picking up Trash on NW 74th

 

Work in the SE section consists of Prepping, Milling and Paving SE 48th

 

Work in the SW section consists of Grading SW 168th St, SW 132nd and SW 130th Pl., Mowing SW CR 231 (Dedan Loop) and SW CR 18 and Picking up cut down and cut up Tree and Debris at the Hampton Boat Ramp