Tentative Work Schedule

February 18, 2021

 

Work in the NW section consists of Grading NW 53rd Ave. and NW 219th Ter., Patching Pot Holes on NW 219th St., Get water flowing on NW 62nd Ave. and Open up Crossover pipe on NW 185th St.

 

Work in the SE section consists of Grading SE 59th Ave. and SE 125th Ter. and Filling in Pot Holes on SE 17th Ave.

 

Work in the SW section consists of Grading SW 168th St. and SW 137th and Smoothing out and cleaning out around a ditch on SW CR 231 (Dedan Loop)

 

 

We received 2 DOC Squads for a total of 7 people

 

1 Squad will be picking up trash and weed eating on NW CR 225

 

1 squad will be Picking up trash and weed eating on SW CR 225 and SW CR 235