Tentative Work Schedule

March 26, 2024

 

Work in the NE section consists of Grading NE 247th St., Carter Road and NE 227th St.

 

Work in the NW section consists of Grading NW 257th St. and NW 236th St.

 

Work in the SE section consists of Grading SE 50th St. (off SE CR 21B) and SE 46th Loop and Patching Pot Holes on SE 2nd and SE 5th

 

Work in the SW section consists of Grading SW 163rd St. and Filling in a washout at the SW 163rd Old Boat Ramp

 

We will also be Hauling Dirt to New River Solid Waste Landfill

 

 

We received 2 DOC (BCSO-JAIL) Officers and 3 Inmates

 

1 Officer will be assisting in Maintenance

 

1 Officer and 3 Inmates will be Cleaning up and Picking up Trash at the SW 163rd Old Boat Ramp, SW 75th Ave. and Sampson Lake Boat Ramp (Trestle)