Tentative Work Schedule

March 25, 2021

 

Work in the NE section consists of Watering NE 204th

 

Work in the NW section consists of Grading NW 211th St. and NW 55th Ave., Patching Pot Holes and Mowing on NW 177th St., Mowing NW CR 229 and Watering NW 185th

 

Work in the SE section consists of Watering SE 52nd and Mowing SE CR 18 and SE CR 221 with the Zero Turn

 

Work in the SW section consists of Grading SW 101st Ave. and SW 163rd St. and Mowing ROW on SW 120th Ave.

 

 

We received 1 DOC Squad for a total of 6 people

 

1 Squad will be Picking up trash and weed eating on SE CR 221