Work Schedule

 

Work in the NE section consists of Digging a ditch and Grading a milled road

 

Work in the NE section consists of Chipping debris and Patching driveway

 

Work int he SE section consists of Pulling ditches and lime rocking a road, Grading, Picking up limbs, Patching pot holes and Trimming ROW

 

Work in the SW section consists of Grading, Pulling ditches and Digging a ditch

 

 

We received 1 DOC Squad for a total of 6 people and will be assisting with Chipping debris in NW

 

 

We received 1 Squad from The Transition House (2 people) and will be patching pot holes and driveways in the SE & NW