Tentative Work Schedule

June 28, 2021

 

Work in the NE section consists of Grading NE 6th Ave. and NE 227th St.

 

Work in the NW section consists of Grading NW 105th Ave. and NW 212th St.

 

Work in the SE section consists of Grading SE 38th Ave.

 

Work in the SW section consists of Building a Headwall on SW 65th Ave. and Picking up trash and Weed eating Sampson Lake Boat Ramp

 

Also will be Mowing the NW CR 229, Starke, Lawtey and Keystone Collection Sites

 

 

We received 2 DOC (BCSO-JAIL) Squads with 2 inmates and they will be assisting with building the Headwall on SW 65th Ave. then Picking up trash and Weed eating the Crosby Lake Boat Ramp