Tentative Work Schedule

September 21, 2020

 

Work in the NE section consists of Grading NW 24th Ave., NE 12th Ave, & NE 173rd St. and Mowing NE 227th St.

 

Work in the NW section consists of Grading NW 45th Ave. (Private), Adding a 4' Extension to a crossover pipe on NW 251st St. and Adding a new Crossover pipe on NW 227th St.

 

Work in the SE section consists of Mowing SE 50th St., SE 51st St. and SE CR 100A

 

Work in the SW section consists of Prepping SW 106th Ave. for Fog Sealing, Grading SW 132nd and Picking up and Chipping limbs on SW CR 18

 

 

We received 1 DOC Squads for a total of 5 people

 

1 Squad will be assisting Charles & John B. with Chipping limbs