Tentative Work Schedule

May 14, 2019

 

Work in the NE section consists of Zipping, Adding milling and Grading NE 7th Ave.

 

Work in the NW section consists of Patching a hole on NW CR 229 and Mow (Zero Turn) NW CR 200A

 

Work in the SE section consists of Grading SE 61st and off SE CR 18 and off SE CR 325

 

Work in the SW section consists of Digging Ditch on SW CR 18 at SW CR 231 (Dedan Loop) and Mow SW CR 231

 

 

We received 3 DOC Squads for a total of 11 people

 

1 Squad will be cutting the asphalt, digging out the culvert and fill hole with concrete on NW CR 229

 

1 Squad will be Picking up trash and weeding eating NW CR 225, starting around NW 34th Ave. and going toward SR 100

 

1 Squad will be directing traffic for digging the ditch on SW CR 18 at SW CR 231 (Dedan Loop)