Tentative Work Schedule

May 13, 2019

 

Work in the NE section consists of Zipping, adding milling and Grading NE 7th Ave.

 

Work in the NW section consists of Mowing NW CR 200A and NW CR 225

 

Work in the SE section consists of Grading SE 126th, SE 129th, SE 38th and down SE 109th

 

Work in the SW section consists of Digging Ditches at the intersection of SW CR 18 and Dedan Loop, Mow (zero turns) SW CR 235 and SW SW 161st St and Patching pot holes on SW 75th Ave.

 

 

We received 2 DOC for a total of 9 people

 

1 Squad will be Picking up trash and weed eating NW CR 225

 

1 Squad will be directing traffic for Digging ditches at the intersection of SW CR 18 and Dedan Loop