Tentative Work Schedule

April 14, 2021

 

Work in the NE section consists of Prepping NE 204th St. for Fog Sealing and Grade NE 247th

 

Work in the NW section consists of Grading NW 257th, Cleaning out the ditch on NW 71st Ave. and Picking up the Stop Sign that was knocked down from Car Accident on NW CR 229A

 

Work in the SE section consists of Grading SE 46th Loop and SE 1st 

 

Work in the SW section consists of Mowing SW CR 235, SW CR 231 and SW 161st and Cleaning out the ditch to get water to flow on SW CR 235

 

 

We did not receive any DOC Squads