Tentative Work Schedule

 

Work in the NW section consists of Limerocking NW 267th St. and Cleaning out and back filling the ditch on NW 53rd                                                         

 

Work in the SE section consists of Adding milling to SE 66th St., Digging ditches in Lincoln City, Patching pot holes on SE 25th Lane and SE 16th St. and Mowing SE 8th Ave., SE CR 21B, SE CR 214 and the Seminole Ridge area

 

Work in the SW section consists of Patching a pot holes on SW 64th, SW 65th, SE 25th Lane and SE 16th St.

 

 

We received 3 DOC Squads for a total of 17 people

 

1 Squad will be picking up trash and weed eating SE CR 21B and SE 8th Ave.

 

1 Squad will be picking up trash and weed eating NW CR 225 starting at SR 16 and going to US Highway 301

 

1 Squad will be patching pot holes on SW 64th, SW 65th, SE 25th Lane & SE 16th St.