Tentative Work Schedule

November 19, 2020

 

Work in the NE section consists of Patching a driveway on NE 19th Ave.

 

Work in the NW section consists of Grading NW 211th St. and NW 55th Ave., Doing Shoulder work on NW CR 225, Mowing ROW on NW 41st Ave., Patching 2 driveway entrances to a trailer park on NW 17tth St. and Mowing NW CR 225

 

Work in the SE section consists of Prepping SE 1st Ave.

 

Work in the SW section consists of Mowing SW CR 100A

 

 

We received 3 DOC Squads for a total of 11 people

 

1 squad will be Emptying the Sand Truck at the Pit and then Picking up trash and weed eating NW CR 225 (Starting at the SR 100 end)

 

1 Squad will be Picking up trash and weed eating NW CR 229 then going to SE 21st Ave.  

 

1 Squad will be Assisting with Patching Pot Holes on a driveway on NE 19th Ave. and Patching the 2 driveway entrances to a trailer park on NW 177th St. (4850 NW 177th St.)