Tentative Work Schedule

March 3, 2020

 

Work in the NE section consists of Patching a drive on NE 17th Ave.

 

Work in the NW section consists of Zipping NW 219th St. and Grading NW 38th Ave. (South of NW 216th St.)

 

Work in the SE section consists of  Filling in and Patching a driveway on SE 3rd Ave. and Installing a Crossover pipe on SE 38th Ave.

 

Work in the SW section consists of Grading SW 64th Ave., SW 163rd St., SW 106th Ave. and SW 104th Ave.

 

 

We received 2 DOC Squads for a total of 8 people

 

1 Squad will be Picking up trash and Weed eating SW CR 18 (Starting on the East side of SW CR 231 (Dedan Loop) and going toward SW CR 227

 

1 Squad will be directing traffic on SE 3rd Ave. for filling in and Patching a driveway.