Work Schedule

 

 

Work in the NW section consists of Grading, Installing culvert, Cutting, Trimming and Chipping

 

Work in the SE section consists of Zipping a road

 

Work in the SW section consists of Milling a road and Patching troughs

 

 

We received 2 DOC Squads for a total of 14 people

 

1 Squad will assist with cleaning out and weed eating a ditch in the NW

 

1 Squad will be assisting with traffic installing a culvert and Digging a ditch in the NW

 

 

1 Squad from The Transition House (5 people) will assist in patching troughs in the SW